Bridge Building 2016

noobforce
Member
Member
Posts: 70
Joined: Wed Mar 14, 2012 3:13 pm
Division: C
State: NJ
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by noobforce »

Is the Test Support going to be secured to the table somehow? I'm imagining that if the tables shakes somehow or something it would wobble and fall over easily.
User avatar
bernard
Administrator
Administrator
Posts: 2416
Joined: Sun Jan 05, 2014 3:12 pm
Division: Grad
State: WA
Pronouns: He/Him/His
Has thanked: 179 times
Been thanked: 758 times

Re: Bridge Building 2016

Post by bernard »

noobforce wrote:Is the Test Support going to be secured to the table somehow? I'm imagining that if the tables shakes somehow or something it would wobble and fall over easily.
No. Unless there's significant wobbling, the test support shouldn't fall over that easily.
"One of the ways that I believe people express their appreciation to the rest of humanity is to make something wonderful and put it out there." – Steve Jobs
drcubbin
Member
Member
Posts: 229
Joined: Fri Jan 09, 2015 6:28 pm
Division: B
State: NY
Has thanked: 123 times
Been thanked: 12 times

Re: Bridge Building 2016

Post by drcubbin »

I appreciate the sketch, but could someone post a pic that would clearly show what this year's set up looks like? ;) :?:
brayden box
Member
Member
Posts: 90
Joined: Mon Sep 21, 2015 7:43 am
Division: B
State: NY
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by brayden box »

The width is going to be the same as last year, right?
BBOX
JonB
Coach
Coach
Posts: 345
Joined: Tue Mar 11, 2014 12:00 pm
Division: C
State: FL
Has thanked: 1 time
Been thanked: 21 times

Re: Bridge Building 2016

Post by JonB »

brayden box wrote:The width is going to be the same as last year, right?

The width of the bridge or the width of the opening?
hogger
Member
Member
Posts: 187
Joined: Wed Jul 12, 2006 7:07 am
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by hogger »

bernard wrote:
noobforce wrote:Is the Test Support going to be secured to the table somehow? I'm imagining that if the tables shakes somehow or something it would wobble and fall over easily.
No. Unless there's significant wobbling, the test support shouldn't fall over that easily.
I just read the rule, so I just started to think about this. But it seems to me that the material, weight and the friction of the loading block surface may be significant factors here. But we don't get to provide our own loading block? Meanwhile the provider of the official loading block can be coach of another team, and they may get unfair advantage here?
JonB
Coach
Coach
Posts: 345
Joined: Tue Mar 11, 2014 12:00 pm
Division: C
State: FL
Has thanked: 1 time
Been thanked: 21 times

Re: Bridge Building 2016

Post by JonB »

hogger wrote:
bernard wrote:
noobforce wrote:Is the Test Support going to be secured to the table somehow? I'm imagining that if the tables shakes somehow or something it would wobble and fall over easily.
No. Unless there's significant wobbling, the test support shouldn't fall over that easily.
I just read the rule, so I just started to think about this. But it seems to me that the material, weight and the friction of the loading block surface may be significant factors here. But we don't get to provide our own loading block? Meanwhile the provider of the official loading block can be coach of another team, and they may get unfair advantage here?

We have noticed that friction (or lack thereof) on the loading block and cause a bridge to slip (or not slip) when you are building right to the edge of the 5x2cm block. However, I think that any advantage to a specific team would be negligible compared to the actual design and build of the structure.
There is really no way to avoid this, it is just part of the competition. No supervisor I have had the pleasure to meet would knowingly give their team an advantage on purpose.
hogger
Member
Member
Posts: 187
Joined: Wed Jul 12, 2006 7:07 am
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by hogger »

Yes supervisors are great people and I thank them over and over again for taking the time to make this happens. So I am not at all suggesting that they are bad people here, I am merely suggesting that if they coach a team also, they have access to the actual apparatus and loading blocks while we don't. If the rule is designed so that those things are factors, then that could be a little bit unfair because we may have to over-design and be prepared for worst case. Like I said, I am not sure about anything until I build and test one of these things.
JonB
Coach
Coach
Posts: 345
Joined: Tue Mar 11, 2014 12:00 pm
Division: C
State: FL
Has thanked: 1 time
Been thanked: 21 times

Re: Bridge Building 2016

Post by JonB »

hogger wrote:Yes supervisors are great people and I thank them over and over again for taking the time to make this happens. So I am not at all suggesting that they are bad people here, I am merely suggesting that if they coach a team also, they have access to the actual apparatus and loading blocks while we don't. If the rule is designed so that those things are factors, then that could be a little bit unfair.

The problem is that it would be impossible to regulate what the block material is. Even if you say that it must be "wood" there are many different types of wood. Ultimately, as a coach, I would say worry about the things you CAN control and let everything else fall into place. Take Electric Vehicle as an example. If your gym floor is more like the floor of the competition, then that's awesome. But, we/you cannot control this so be ready for anything.
hogger
Member
Member
Posts: 187
Joined: Wed Jul 12, 2006 7:07 am
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by hogger »

JonB wrote:
hogger wrote:Yes supervisors are great people and I thank them over and over again for taking the time to make this happens. So I am not at all suggesting that they are bad people here, I am merely suggesting that if they coach a team also, they have access to the actual apparatus and loading blocks while we don't. If the rule is designed so that those things are factors, then that could be a little bit unfair.

The problem is that it would be impossible to regulate what the block material is. Even if you say that it must be "wood" there are many different types of wood. Ultimately, as a coach, I would say worry about the things you CAN control and let everything else fall into place. Take Electric Vehicle as an example. If your gym floor is more like the floor of the competition, then that's awesome. But, we/you cannot control this so be ready for anything.
That is the first thing that pops up to me. What should I use for loading block? What material and weight? Because there is a lateral force here, and it is not secured. How do I make that stable enough to hold the maximum weight? Hmm, it could be a pretty big factor here, or maybe not....

Return to “Bridge Building B/C”