Bridge Building 2016

User avatar
Mr_Pep_Band
Member
Member
Posts: 11
Joined: December 15th, 2015, 1:12 pm
Division: Grad
State: ND
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by Mr_Pep_Band »

Thanks for the rules clarification/confirmation. I was thinking along the same lines as far as abutment block location and the 2 cm rule on the opposite side.
ND State Competition Facilitator
Towers, Boomilever, and Bridge Building 2011-2016

"A good Design needs to have good Fabrication"

Divison C Competitor 2009
User avatar
Entomology
Member
Member
Posts: 118
Joined: September 17th, 2015, 1:56 pm
Division: C
State: CA
Has thanked: 0
Been thanked: 1 time

Re: Bridge Building 2016

Post by Entomology »

I was wondering if someone could help me out a bit,
At our regionals, we normally pour the sand in a bucket using a cup, but at the three invitationals in my area+state, it is a lever that is used to put sand in the bucket. I've tried the lever before once-personally I find it hard to control. Any tips? Thank you!
CCA '20 Captain
Herpetology, Fossils, Boomilever, Mousetrap Vehicle
User avatar
Unome
Moderator
Moderator
Posts: 4321
Joined: January 26th, 2014, 12:48 pm
Division: Grad
State: GA
Has thanked: 228 times
Been thanked: 82 times

Re: Bridge Building 2016

Post by Unome »

Entomology wrote:I was wondering if someone could help me out a bit,
At our regionals, we normally pour the sand in a bucket using a cup, but at the three invitationals in my area+state, it is a lever that is used to put sand in the bucket. I've tried the lever before once-personally I find it hard to control. Any tips? Thank you!
What do you mean by hard to control? As in the setup doesn't work properly, or is it that it's difficult to get the optimum amount of sand flowing?
Userpage

Opinions expressed on this site are not official; the only place for official rules changes and FAQs is soinc.org.
User avatar
bernard
Administrator
Administrator
Posts: 2493
Joined: January 5th, 2014, 3:12 pm
Division: Grad
State: WA
Pronouns: He/Him/His
Has thanked: 184 times
Been thanked: 780 times
Contact:

Re: Bridge Building 2016

Post by bernard »

Entomology wrote:I was wondering if someone could help me out a bit,
At our regionals, we normally pour the sand in a bucket using a cup, but at the three invitationals in my area+state, it is a lever that is used to put sand in the bucket. I've tried the lever before once-personally I find it hard to control. Any tips? Thank you!
Consider asking the Event Supervisor if you can do a test on-off of the sand loader. I think allowing such a test would be justified, as it's better that you are comfortable with operation than have the sand running for 3-5 seconds after bridge failure.
"One of the ways that I believe people express their appreciation to the rest of humanity is to make something wonderful and put it out there." – Steve Jobs
Engineer13
Member
Member
Posts: 1
Joined: March 17th, 2016, 4:24 pm
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by Engineer13 »

Okay so I have a question. If i took a piece of balsa wood board and cut strips of it for my bridge supports to sit on will it counted off on the rules?scioly.org/rules
User avatar
Unome
Moderator
Moderator
Posts: 4321
Joined: January 26th, 2014, 12:48 pm
Division: Grad
State: GA
Has thanked: 228 times
Been thanked: 82 times

Re: Bridge Building 2016

Post by Unome »

Engineer13 wrote:Okay so I have a question. If i took a piece of balsa wood board and cut strips of it for my bridge supports to sit on will it counted off on the rules?scioly.org/rules
What do you mean by bridge supports? Do you mean laminating your wood? More detailed questions tend to get more detailed answers.
Userpage

Opinions expressed on this site are not official; the only place for official rules changes and FAQs is soinc.org.
User avatar
Mr_Pep_Band
Member
Member
Posts: 11
Joined: December 15th, 2015, 1:12 pm
Division: Grad
State: ND
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by Mr_Pep_Band »

Engineer13 wrote:Okay so I have a question. If i took a piece of balsa wood board and cut strips of it for my bridge supports to sit on will it counted off on the rules?scioly.org/rules
Do you mean using your own built block that is 5x5x2 cm for the one end of the bridge to rest upon? Instead of using the provided block?

Or are the strips a sort of bearing plate that the bridge rests on the abutment?
ND State Competition Facilitator
Towers, Boomilever, and Bridge Building 2011-2016

"A good Design needs to have good Fabrication"

Divison C Competitor 2009
leinad520
Member
Member
Posts: 6
Joined: March 13th, 2016, 6:59 am
Division: C
State: NC
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by leinad520 »

Entomology wrote:I was wondering if someone could help me out a bit,
At our regionals, we normally pour the sand in a bucket using a cup, but at the three invitationals in my area+state, it is a lever that is used to put sand in the bucket. I've tried the lever before once-personally I find it hard to control. Any tips? Thank you!
To start off with, you should start slowly letting the sand flow in, once there is a small steady flow, you can start to gradually increase the sand flow. However, you don't want to let to much sand come out at once, because the sudden amount of mass on your bridge can break it easily. You should practice with the loader more and test bridges with a loader like that, to find out how much sand you need to let in a once, and the speed in which you add more and more sand.
"Strong Mental"
User avatar
Entomology
Member
Member
Posts: 118
Joined: September 17th, 2015, 1:56 pm
Division: C
State: CA
Has thanked: 0
Been thanked: 1 time

Re: Bridge Building 2016

Post by Entomology »

leinad520 wrote:
Entomology wrote:I was wondering if someone could help me out a bit,
At our regionals, we normally pour the sand in a bucket using a cup, but at the three invitationals in my area+state, it is a lever that is used to put sand in the bucket. I've tried the lever before once-personally I find it hard to control. Any tips? Thank you!
To start off with, you should start slowly letting the sand flow in, once there is a small steady flow, you can start to gradually increase the sand flow. However, you don't want to let to much sand come out at once, because the sudden amount of mass on your bridge can break it easily. You should practice with the loader more and test bridges with a loader like that, to find out how much sand you need to let in a once, and the speed in which you add more and more sand.
Thank you to everyone who helped me! I will ask my event coordinator.
CCA '20 Captain
Herpetology, Fossils, Boomilever, Mousetrap Vehicle
User avatar
Entomology
Member
Member
Posts: 118
Joined: September 17th, 2015, 1:56 pm
Division: C
State: CA
Has thanked: 0
Been thanked: 1 time

Re: Bridge Building 2016

Post by Entomology »

Hate to sort-of double post, but I didn't know where else this should go.

Even though the bridge season is over for me, I was curious on this technique I've heard of called "pre-stressing", where you test your device to about 3/4 of its capability, and then stop. I've tried it before, but as soon as we decided to stop, my partner and I realized that we didn't have any safe way of removing the device without it breaking. Does anyone have a safe way of removing a pre stressed bridge?
CCA '20 Captain
Herpetology, Fossils, Boomilever, Mousetrap Vehicle
Locked

Return to “Bridge Building B/C”

Who is online

Users browsing this forum: No registered users and 2 guests